Power Utilities
Client |
Project |
Location |
Year |
| LKH Transformer Manufacture on behalf of TNB |
Transformer maintenance for 2 x 30 MVA 132/11 kV transformer
|
Mengkibul TNB Main Intake, Kluang |
October 2002 |
Sisma Electrical on behalf of TNB |
Transformer installation, vacuum oil filling and oil filtration for 1 x 30 MVA 132/11 kV transformer |
TNB PMU at Sungai Raya Muar. |
October 2003 |
| Permata Innovasi Sdn. Bhd. on behalf of TNB |
Transformer installation and oil filtration for 2 x 30 MVA 33/11 kV transformer |
TNB PPU at Mutiara Damansara |
November 2003 |
| HL System on behalf of TNB Distribution, Shah Alam |
Transformer installation and oil filtration for 1 x 15 MVA 33/11 kV transformer |
TNB PPU at Rawang Batu 16 |
October 2004 |
| Akli (M) Sdn. Bhd. on behalf of TNB Distribution Putrajaya |
Transformer refurbishment for 30 MVA 33/11 kV Sengyang Transformer c/w oil filtration, gasket change and repainting the whole body of transformer |
Cyberjaya PPU6 |
March 2005 |
| HL System on behalf of TNB Distribution, Shah Alam |
Transformer installation and oil filtration for 2 x 30 MVA 33/11 kV transformer |
TNB PPU at Bukit Lancung, Shah Alam |
April
2005 |
| Akli (M) Sdn. Bhd. on behalf of TNB Distribution Putrajaya |
Transformer refurbish including HV & LV Bushing gasket replacement, Main tank top inspection cover gasket, repainting , filtration and etc c/w carry out oil drain procedure for T1 & T2 |
Putrajaya
PPU4 |
June
2006 |
| Akli (M) Sdn. Bhd. on behalf of TNB Distribution Putrajaya |
Transformer refurbish including HV & LV Bushing gasket replacement, Main tank top inspection cover gasket, repainting , filtration and etc c/w carry out oil drain procedure for T1 & T2 |
Putrajaya
PPU5 |
July 2006 |
PTIS Engineering Sdn.Bhd. on behalf of TNB Dist. Putrajaya |
Transformer maintenance-leaking repair and CT Terminal bushing replacement for all Sengyang Transformer 7 x 30 MVA 33/11 kV |
Putrajaya and Cyberjaya |
July 2007 |
Tonggak Selatan Sdn.Bhd. on behalf of TNB Dist. Putrajaya |
Transformer refurbish including OLTC chamber gasket replacement, Main tank top inspection cover gasket, repainting , filtration and etc c/w carry out oil drain procedure for T1 & T2, 30 MVA 33/11 kV |
Putrajaya PPU6
&
Cyberjaya CJ7. |
September
2007 |
| Metro Kristal Sinar Sdn. Bhd. |
Kerja-kerja merombak, memasang dan memula tugas 2 x 30MVA 132/11kV alat ubah kuasa (T1 & T2) dari lapangsuis sementara ke lapangsuis kekal. |
PMU Kuantan, Pahang. |
April 2008 |
| Zest Module (M) Sdn. Bhd. |
Transformer Oil Filtration for 2 x 90MVA 132/33kV |
PMU Tanjung Langsat, Johor |
March 2009 |
Back to top
General and Commercial Industries
Client |
Project |
Location |
Year |
| Balfour Beatty Rail Sdn.Bhd. on behalf of KTMB |
Transformer installation and vacuum oil filling for 2 x 20 MVA 132/25 kV transformer |
Rawang Feeder Station |
September
2003 |
| Akran Engineering Sdn. Bhd. (Universiti Islam Antarabangsa Malaysia) |
Transformer maintenance, gasket replacement and oil filtration for TX 3, 1 X 15 MVA 33/11 kV |
UIA PMU at Gombak |
March 2004 |
| Perusahaan Otomobil Nasional Berhad |
Transformer condition monitoring (51 units transformer) |
PROTON Substation and Power House |
September
2004 |
| SISMA Enterprise Sdn. Bhd. on behalf of MTM |
Transformer installation, vacuum oil filling and oil filtration for 1 x 90 MVA 132/33 kV ABB transformer |
SISMA / MTM, Ulu Klang |
October 2004 |
| JM Electrical Services Sdn. Bhd. for AREVA Singapore |
Transformer installation, vacuum oil filling and oil filtration for 2 x 25 MVA 11/6.9 kV Alsthom transformer |
MSE, Pasir Gudang |
December 2004 |
| PROTON Casting Sdn. Bhd. Shah Alam |
Transformer Maintenance leaking repair c/w oil top-up and Filtration for 2000 kVA ABB transformer |
PROTON Casting Shah Alam |
March
2005 |
| Balfour Beatty Rail Sdn.Bhd |
To carry out transformer drain for radiation replacement & vacuum oil filling c/w filtration |
Sungkai Feeder |
June
2005 |
| SPM-TACS Services (M) Sdn. Bhd. |
Supervision of Transformer oil reclamation |
KLIA Airport 33 kV Substation |
December 2005 |
| PROTON Tanjung Malim Sdn.Bhd. |
To repair and service transformer 33/11 kV |
Energy Center, PROTON |
January 2006 |
| NEXUS ENERGY Sdn.Bhd. on behalf of Amsteel |
Oil filtration and supply of gasket for 80 MVAr reactor |
Siemens factory |
February 2006 |
| MMC Metal Industries Sdn.Bhd. |
Transformer maintenance-leaking repair,repaint,oil top-up & filtration for transformer unit Tx 3 |
Ipoh, Perak |
February 2007 |
PTIS Engineering Sdn.Bhd. on behalf of MTM. |
Transformer installation and vacuum oil filling c/w oil filtration for 2 x 90 MVA 132/11 kV |
PMU Skudai |
May 2007 |
| TXM Services Sdn. Bhd. |
Transformer Maintenance - Oil drain, HT Bushing Gasket replace and re-termination 33kV joint c/w oil filtration for 1 x 10MVA 33/11kV Transformer |
Puncak Niaga (M) Sdn. Bhd. |
February 2008 |
| Perusahaan Otomobil Nasional Sdn. Bhd. |
Service OLTC - ABB 33kV 10MVA Transformer TX-02 |
Power House |
August 2008 |
| TXM Services Sdn. Bhd. |
Transformer Maintenance - Leakage repair on LV Bushing, Neutral Bushing and oil filtration for 1 x 35MVA Power Transformer 132/11kV |
Lafarge Cement, Rawang. |
November 2008 |
| TXM Services Sdn. Bhd. |
Transformer Maintenance - Carry out leakage repair on LV Bushing for 1 x 3150kVA 11/.433kV |
Intel, Kulim Hi-Tech, Kedah. |
January 2009 |
Back to top
Oil, Gas and Petrochemicals Companies
Client |
Project |
Location |
Year |
| TXM Services Sdn. Bhd. |
Transformer maintenance – vacuum dehydration for 2 x 5 MVA and 2 x 1500kVA |
BP Chemical in Gebeng, Pahang |
August 2006 |
Natural Places (M) Sdn. Bhd. |
Transformer refurbish including HV & LV Bushing gasket replacement, Turret gasket replacement, inspection cover gasket, vacuum oil filling, repainting and filtration |
CUFK Petronas Gas Berhad, Kertih. |
July
2007 |
PTIS Enginnerin Sdn.Bhd. on behalf of AREVA Singapore |
Transformer refurbish including OLTC servicing, chamber gasket replacement, Main tank top gasket replacement, inspection cover gasket, repainting , filtration and etc c/w carry out oil drain procedure for 2 x 48 MVA 132/33 kV and 2 x Earthing Transformer |
Shell Refinary, Port Dickson. |
October 2007 |
| AKM Teknik Sdn. Bhd. |
Transformer Oil Change c/w oil filtration for 2 x 10MVA 33/11kV |
Petronas Research, Bangi. |
February 2008 |
| AKM Teknik Sdn. Bhd. |
Transformer Maintenance - MR OLTC Servicing Model V III 200 D c/w oil filtration for 2 x 7.5MVA 22/11kV |
Petronas Research, Bangi. |
February 2008 |
| TXM Services Sdn. Bhd. |
Transformer Maintenance - Top Gasket replacement c/w oil top-up and oil filtration for 1 x 1.5MVA 22/.433kV |
IOI Loders Croklaan, Pasir Gudang. |
February 2008 |
| PTIS Engineering Sdn. Bhd. |
Transformer Maintenance - Total refurbish of 2 x 48MVA 132/33kV Earthing Transformer |
Shell Refinary, Port Dickson. |
February 2008 |
| Transformer Oil Lab & Services Sdn. Bhd. |
Transformer Maintenance - LV Bushing Gasket replacement c/w oil top up and filtration for 1 x 8MVA 11/3.3kV |
Petronas Penapisan (T) Sdn. Bhd. |
July 2008 |
| Jurutera Uji Tatah Sdn. Bhd. |
Transformer Maintenance - Main Tank top gasket and Bushing gasket replacement for 3 x 125kVA |
BASF, Pasir Gudang. |
February 2009 |