SNA Gemilang Logo
Project


   
     
     
     

Power Utilities

Client
Project
Location
Year
LKH Transformer Manufacture on behalf of TNB

Transformer maintenance for 2 x 30 MVA 132/11 kV transformer

Mengkibul TNB Main Intake, Kluang
October 2002
Sisma Electrical on behalf of TNB
Transformer installation, vacuum oil filling and oil filtration for 1 x 30 MVA 132/11 kV transformer
TNB PMU at Sungai Raya Muar.
October 2003
Permata Innovasi Sdn. Bhd. on behalf of TNB

Transformer installation and oil filtration for 2 x 30 MVA 33/11 kV transformer

TNB PPU at Mutiara Damansara November 2003
HL System on behalf of TNB Distribution, Shah Alam

Transformer installation and oil filtration for 1 x 15 MVA 33/11 kV transformer

TNB PPU at Rawang Batu 16 October 2004
Akli (M) Sdn. Bhd. on behalf of TNB Distribution Putrajaya

Transformer refurbishment for 30 MVA 33/11 kV Sengyang Transformer c/w oil filtration, gasket change and repainting the whole body of transformer

Cyberjaya PPU6 March 2005
HL System on behalf of TNB Distribution, Shah Alam

Transformer installation and oil filtration for 2  x 30 MVA 33/11 kV transformer

TNB PPU at Bukit Lancung, Shah Alam April
2005
Akli (M) Sdn. Bhd. on behalf of TNB Distribution Putrajaya

Transformer refurbish including HV & LV Bushing gasket replacement, Main tank top inspection cover gasket, repainting , filtration and etc c/w carry out oil drain procedure for T1 & T2

Putrajaya
PPU4
June
2006
Akli (M) Sdn. Bhd. on behalf of TNB Distribution Putrajaya

Transformer refurbish including HV & LV Bushing gasket replacement, Main tank top inspection cover gasket, repainting , filtration and etc c/w carry out oil drain procedure for T1 & T2

Putrajaya
PPU5
July 2006

PTIS Engineering Sdn.Bhd. on behalf of TNB Dist. Putrajaya

Transformer maintenance-leaking repair and CT Terminal bushing replacement for all Sengyang Transformer 7 x  30 MVA 33/11 kV 

Putrajaya and Cyberjaya July 2007

Tonggak Selatan Sdn.Bhd. on behalf of TNB Dist. Putrajaya

Transformer refurbish including OLTC chamber gasket replacement, Main tank top inspection cover gasket, repainting , filtration and etc c/w carry out oil drain procedure for T1 & T2,  30 MVA 33/11 kV

Putrajaya PPU6
&
Cyberjaya CJ7.
September
2007
Metro Kristal Sinar Sdn. Bhd. Kerja-kerja merombak, memasang dan memula tugas 2 x 30MVA 132/11kV alat ubah kuasa (T1 & T2) dari lapangsuis sementara ke lapangsuis kekal. PMU Kuantan, Pahang. April 2008
Zest Module (M) Sdn. Bhd. Transformer Oil Filtration for 2 x 90MVA 132/33kV PMU Tanjung Langsat, Johor March 2009
Musteq Hydro Sdn. Bhd. Maintenance work of AUX transformer 1 x 100kVA 33/0.433kV Upper Power House, Kenerong Hydro Power Station. March 2009
Malaysia Transformer Manufacturing Sdn. Bhd. Transformer Oil Filtration and ABB OLTC Kapar Energy Ventures. June 2009
Malaysia Transformer Manufacturing Sdn. Bhd. Transformer Oil Filtration – Mitsubishi Transformer GT2 S.J Temenggor. June 2009
Malaysia Transformer Manufacturing Sdn. Bhd Transformer Oil Filtration – MTM Transformer & OLTC PPU TLDM Lumut. July 2009
Malaysia Transformer Manufacturing Sdn. Bhd Transformer oil filtration, draining, vacuuming and oil test for 2 X 30MVA 132/11KV Hyusung Power transformer PMU Ayer Keroh, Melaka. July 2009
Malaysia Transformer Manufacturing Sdn. Bhd Transformer oil filtration, draining, vacuuming and oil test for 2 X 15MVA Jian Xi Power transformer and OLTC PPU Bandar Baru Sungai Buluh. August 2009
Malaysia Transformer Manufacturing Sdn. Bhd Oil Filtration Earthing transformer PMU Bukit Jelutong, Shah Alam, Selangor. September 2009
Malaysia Transformer Manufacturing Sdn. Bhd Oil draining, oil filtration inside skid tank and main tank (8000litres), separate OLTC oil filtration, vacuuming and oil test before and after for T1 15MVA 33/11kV PPU Padang Tembak. December 2009
MHM Electrical & Engineering Sdn. Bhd. Installation, Pre-Commissioning & Testing of 2 X 30MVA 33/11KV MTM Power transformer and 1 X Local Transformer PPU Keluli 12, Johor Darul Takzim. December 2009
MHM Electrical & Engineering Sdn. Bhd. Installation, Pre-Commissioning & Testing of 2 X 30MVA 33/11KV MTM Power transformer and 1 X Local Transformer PPU Jalan Universiti, Selangor Darul Ehsan. December 2009
Malaysia Transformer Manufacturing Sdn. Bhd. Oil filtration for GT1A 285MVA 15/275KV and oil draining, vacuuming and oil filtration for STN1A, 32.5MVA Tuanku Jaafar Power Station, P.D. March 2010
MHM Electrical & Engineering Sdn. Bhd. Installation, Pre-commisioning & testing of 1 X 30MVA 33/11KV TX2, MTM Power transformer PPU Bukit Indah, Johor Bharu. March 2010
MHM Electrical & Engineering Sdn. Bhd. Installation, Pre-commisioning & testing of 2 X 30MVA 33/11KV TX1 & TX2, MTM power transformer Stesyen Switch Solaris Dutamas, Kuala Lumpur. March 2010
Malaysia Transformer Manufacturing Sdn. Bhd. Transformer vacuuming & oil filtration Pergau Power Station, Kelantan. April 2010
S.M. Muhibah Heavy Engineering & Construction (M) Sdn.Bhd. Transformer vacuuming and oil filtration for 1 X 15MVA Power Transformer PMU Jerantut. April 2010
Anpec Global Corporation Sdn. Bhd. Kerja-Kerja mengimpal dan mengecat alatubah T1 30MVA 132/KV buatan Hyosung PMU Yong Peng South 132/11KV

July 2010

Anpec Global Corporation Sdn. Bhd. Transformer Maintenance – Main Tank top cover welding, gasket replacement, whole transformer body repainting c/w vacuuming and oil filtration for 7.5MVA 132/11 KV ELTA power transformer PMU Jerantut. July 2010
S.M. Muhibbah Heavy Engineering & Construction (M) Sdn. Bhd. Transformer oil change, vacuuming and oil filtration for 1 X 15MVA 132/11 kV power transformer PMU Jengka Pahang. July 2010
Anpec Global Sdn. Bhd. Supply labour for Inter Bus transformer maintenance PMU Yong Peng North. December 2010
I.A Services Sdn. Bhd. Transformer Oil Top-Up and oil filtration for 1 X 30MVA 33/22/11kV MTM/CGL transformer PMU Papan, Ipoh. January 2011
Malaysia Transformer Manufacturing Sdn. Bhd Oil Filtration & Vacuuming for 30MVA 132/32KV transformer PMU Parit Yusof ,Batu Pahat Johor. February 2011
MNA Trading Sdn. Bhd. Installation, Pre-Commisioning & testing of 2 X 30MVA TX1 & TX2 MTM power transformer Taman Putri Kulai Jaya, Johor Bahru. February 2011
MNA Trading Sdn. Bhd. Installation, Pre-Commisioning & testing of 2 X 30MVA TX1 & TX2 MTM power transformer Damansara Aliff, Kempas Johor Bahru. February 2011
Malaysia Transformer Manufacturing Sdn. Bhd. Oil Filtration and vacuuming process for 2 unit transformer T1 & T2 12.5MVA 22/6.6KV ATA POLAND PPU Kastam, Johor. March 2011
Malaysia Transformer Manufacturing Sdn. Bhd. Oil Filtration for 1 X 30MVA 33/11KV VEB transformer PPU Uda Bangsar, Kuala Lumpur March 2011
Malaysia Transformer Manufacturing Sdn. Bhd. Oil Filtration & Services transformer for 2 unit transformer 12.5MVA 22/6.6KV PPU JB Perdana, Johor Bahru. May 2011
Fausniaga Sdn. Bhd. Installation, Pre-Commisioning & testing of 2 X 15MVA, 33/11KV, TX1 & TX2, MTM Power transformer PPU UMK Bachok, Kelantan. May 2011
I.A Services Sdn. Bhd. To Oil Filtration & Vacuuming of 2 X 5MVA 33/11KV at PPU PULKA Bentong Pahang, 2 X 30MVA 33/11KV at PPU Tampoi, Johor & 2 X 10MVA 33/11kV PPU Energy Ventures, Kapar Selangor. July 2011
Musteq Hydro Sdn. Bhd. Transformer Maintenance : Oil Filtration For Upper Station Unit 11 and lower station unit T23 Kenerong Hydro Power Station. August 2011
MTM Transformer Manufacturing Sdn. Bhd. Oil Filtration for 2 X 12.5MVA 22/6.6KV FUZHOU Tx PPU Taman Sentosa, Johor Bahru. August 2011
Duta Technic Sdn. Bhd. Transformer accessories erection c/w vacuum oil filling and filtration for 2 x 90 MVA 132/90 kV Pouwels Trafo transformer PMU Sg Karang, Tg. Bin, Johor. February 2012

Back to top

General and Commercial Industries

Client
Project
Location
Year
Balfour Beatty Rail Sdn.Bhd. on behalf of KTMB

Transformer installation and vacuum oil filling for 2 x 20 MVA 132/25 kV transformer

Rawang Feeder Station September
2003
Akran Engineering Sdn. Bhd. (Universiti Islam Antarabangsa Malaysia)

Transformer maintenance, gasket replacement and oil filtration for TX 3,  1 X 15 MVA 33/11 kV

UIA PMU at Gombak March 2004
Perusahaan Otomobil Nasional Berhad

Transformer condition monitoring (51 units transformer)

PROTON Substation and Power House September
2004
SISMA Enterprise Sdn. Bhd. on behalf of MTM Transformer installation, vacuum oil filling and oil filtration for 1 x 90 MVA 132/33 kV ABB transformer SISMA / MTM, Ulu Klang October 2004
JM Electrical Services Sdn. Bhd. for AREVA Singapore

Transformer installation, vacuum oil filling and oil filtration for 2 x 25 MVA 11/6.9 kV Alsthom transformer

MSE, Pasir Gudang December 2004
PROTON Casting Sdn. Bhd. Shah Alam

Transformer Maintenance leaking repair c/w oil top-up and Filtration for 2000 kVA ABB transformer

PROTON Casting Shah Alam March
2005
Balfour Beatty Rail Sdn.Bhd

To carry out transformer drain for radiation replacement & vacuum oil filling c/w filtration

Sungkai Feeder June
2005
SPM-TACS Services (M) Sdn. Bhd.

Supervision of Transformer oil reclamation

KLIA Airport 33 kV Substation December 2005
PROTON Tanjung Malim Sdn.Bhd.

To repair and service transformer 33/11 kV

Energy Center, PROTON January 2006
NEXUS ENERGY Sdn.Bhd. on behalf of Amsteel

Oil filtration and supply of gasket for 80 MVAr reactor

Siemens factory February 2006
MMC Metal Industries Sdn.Bhd.

Transformer maintenance-leaking repair,repaint,oil top-up & filtration for transformer unit Tx 3

Ipoh, Perak February 2007

PTIS Engineering Sdn.Bhd. on behalf of MTM.

Transformer installation and vacuum oil filling c/w oil filtration for 2 x 90 MVA 132/11 kV

PMU Skudai May 2007
TXM Services Sdn. Bhd. Transformer Maintenance - Oil drain, HT Bushing Gasket replace and re-termination 33kV joint c/w oil filtration for 1 x 10MVA 33/11kV Transformer Puncak Niaga (M) Sdn. Bhd. February 2008
Perusahaan Otomobil Nasional Sdn. Bhd. Service OLTC - ABB 33kV 10MVA Transformer TX-02 Power House August 2008
TXM Services Sdn. Bhd. Transformer Maintenance - Leakage repair on LV Bushing, Neutral Bushing and oil filtration for 1 x 35MVA Power Transformer 132/11kV Lafarge Cement, Rawang. November 2008
TXM Services Sdn. Bhd. Transformer Maintenance - Carry out leakage repair on LV Bushing for 1 x 3150kVA 11/.433kV Intel, Kulim Hi-Tech, Kedah. January 2009
TXM Services Sdn. Bhd. Transformer Maintenance Malay-Sino Chemical Industries Sdn. Bhd. Malay-Sino Chemical Industries Sdn. Bhd. June 2009
TXM Services Sdn. Bhd. Transformer maintenance Lafarge Malayan cement, Rawang Selangor. September 2009
PROTON Shah Alam. Replace oil transformer No.3 10 MVA 33/11KV Brand ABB at Power house inclusive filtration and oil sampling analysis. PROTON Shah Alam. October 2009
PROTON Shah Alam. Repair oil leakage at bushing gasket ( ABB Transformer at main plant & MVF ) PROTON Shah Alam. October 2009
TXM Services Sdn. Bhd. Outdoor Surge Arrester, Isolator and circuit breaker cleaning for Lafarge Rawang outdoor switch yard equipment. Lafarge Malayan cement, Rawang Selangor. March 2010
SHR Engineering (M) Sdn. Bhd. Transformer maintenance – leakage repair C/W refurbishment and testing of 1 X 15MVA 33/11KV University Kebangsaan Malaysia, Bangi. May 2010
Samsung SDI (Malaysia) Bhd. Leakage repair for 1 unit of 2500KVA transformers (TR-8302) Samsung SDI (Malaysia) Bhd. June 2010
TXM Services Sdn. Bhd. Supply and replace 4 units new breather with capacity 1kg silica gel for three phase rectifier transformer Tx10, 11, 12 and 13 Amsteel, Banting. Agust 2010
TXM Services Sdn. Bhd. Transformer maintenance- leakage repair c/w oil filtration for tpe-1 plant main 20 MVA 22/6.6KV Pouwel transformer (TR-9801) Titan, Pasir Gudang. April 2011
UT Generation Sdn. Bhd. To supply, installation, testing, commissioning & maintenance of electrical services for electrical services for existing CSR CX2 Sdn. Bhd. Data centre of CSF computer Exchange. CSR CX2 Sdn. Bhd. October 2011
McGIL Supply & Services To replace main tank top gasket only work including ; filtration, top up oil & oil testing , main tank gasket replacement. Transformer 750KVA Hunstman Tioxide (M) Sdn. Bhd. October 2011
Sapura Malaysian Advanced Refurbishment Services Sdn. Bhd. To provide tolls, equipment & Skilled manpower to rectify oil leakage at butterfly valves (12 NOS) & PRD for 1 X 25MVA 132/6.6KV transformer No.2 Sapura Malaysian Advanced Refurbishment Services Sdn. Bhd. October 2011
PROTON Shah Alam. Replace the on-load tap changer (OLTC) oil of abb 10MVA 33/11KV transformer TX#03/TX#4 at Power House. PROTON Shah Alam. January 2012
TRMS Engineering Sdn. Bhd. OLTC filtration SGL Carbon, Banting, Selangor. February 2012
Perusahan Otomobil Nasional Sdn. Bhd. To supply and replace of Bushing Gasket complete with top up of oil transformer inclusive oil filtration works for 33kv/11kv 10MVA transformer no.3 & 11kV/ 415V 2000KVA ABB transformer no-38. Perusahan Otomobil Nasional Sdn. Bhd. March 2012

Back to top

Oil, Gas and Petrochemicals Companies

Client
Project
Location
Year
TXM Services Sdn. Bhd.

Transformer maintenance – vacuum dehydration for 2 x 5 MVA and 2 x 1500kVA

BP Chemical in Gebeng, Pahang August 2006

Natural Places (M) Sdn. Bhd.

Transformer refurbish including HV & LV Bushing gasket replacement, Turret gasket replacement, inspection cover gasket, vacuum oil filling, repainting and filtration

CUFK Petronas Gas Berhad, Kertih. July
2007

PTIS Enginnerin Sdn.Bhd. on behalf of AREVA Singapore

Transformer refurbish including OLTC servicing,  chamber gasket replacement, Main tank top gasket replacement, inspection cover gasket, repainting , filtration and etc c/w carry out oil drain procedure for 2 x 48 MVA 132/33 kV and 2 x Earthing Transformer

Shell Refinary, Port Dickson. October 2007
AKM Teknik Sdn. Bhd. Transformer Oil Change c/w oil filtration for 2 x 10MVA 33/11kV Petronas Research, Bangi. February 2008
AKM Teknik Sdn. Bhd. Transformer Maintenance - MR OLTC Servicing Model V III 200 D c/w oil filtration for 2 x 7.5MVA 22/11kV Petronas Research, Bangi. February 2008
TXM Services Sdn. Bhd. Transformer Maintenance - Top Gasket replacement c/w oil top-up and oil filtration for 1 x 1.5MVA 22/.433kV IOI Loders Croklaan, Pasir Gudang. February 2008
PTIS Engineering Sdn. Bhd. Transformer Maintenance - Total refurbish of 2 x 48MVA 132/33kV Earthing Transformer Shell Refinary, Port Dickson. February 2008
Transformer Oil Lab & Services Sdn. Bhd. Transformer Maintenance - LV Bushing Gasket replacement c/w oil top up and filtration for 1 x 8MVA 11/3.3kV Petronas Penapisan (T) Sdn. Bhd. July 2008
Jurutera Uji Tatah Sdn. Bhd. Transformer Maintenance - Main Tank top gasket and Bushing gasket replacement for 3 x 125kVA BASF, Pasir Gudang. February 2009
Natural Places (M) Sdn.Bhd. At CUF Kerteh. Transformer Maintenance – Repair transformer leak PGB – CUF Kerteh. May 2009
TRMS Engineering Sdn. Bhd. Kerteh. Transformer repair work Petlin, Kerteh. November 2009
Nexus Energy Sdn. Bhd. Transformer Vacuum oil filling C/W oil filtration and leak test for 1 X 100MVA 132/34.5/11KV Ethylene Malaysia Sdn. Bhd. January 2010
Natural Places (M) Sdn. Bhd. Transformer maintenance - Transformer oil leak repair Petronas Penapisan (Melaka) Sdn. Bhd. January 2010
Shell Refining Company Transformer lekage repair for HV & LV bushing, inspection cover and necessary. Shell Refining Company September 2010
Shell Refining Company Transformer refurbishment c/w gasket change, oil filtration and repainting the whole transformer body. Shell Refining Company December 2010
Natural Places Sdn. Bhd. Transformer Maintenance – Transformer oil leak repair 9 units 11 kV up to 132 kV 70/90 MVA Petronas Penapisan (Melaka) Sdn. Bhd. February 2011
Tenaga Setiavesta Sdn. Bhd. Provision for power and distribution transformer oil leak rectification and repair works for 19 units. 11 kV up to 132 kV transformer Petronas Penapisan (Melaka) Sdn. Bhd. February 2011
Shell Refining Company (Federation of Malaysia) Transformer Refurbishment – gasket replacement for all gasket section including main tank top cover, HV & LV bushing, inspection cover, valves, flanges c/w oil filtration and repainting the whole transformer body for unit TR60 BD4 33/6.6kV Shell refining company, Port Dickson. April 2011
TRMS Engineering Sdn. Bhd. Transformer Maintenance : LV / Secondary Side Bushing Gasket Replacement PFKSB. September 2011
TRMS Engineering Sdn. Bhd. Transformer oil sampling and analysis Petlin, Paka, Terengganu. November 2011
Anugerah Kecapaian Sdn. Bhd Transformer Oil Leak Repair Petronas Penapisan Melaka Sdn. Bhd. November 2011
PTIS Engineering Sdn. Bhd on Replace and maintenance TR132BD1 Shell Refining Company. January 2012
TRMS Engineering Sdn. Bhd. Oil sampling and OLTC oil change PFK, Gurun, kedah. March 2012