Client |
Project |
Location |
Year |
| LKH Transformer Manufacture on behalf of TNB |
Transformer maintenance for 2 x 30 MVA 132/11 kV transformer
|
Mengkibul TNB Main Intake, Kluang |
October 2002 |
Sisma Electrical on behalf of TNB |
Transformer installation, vacuum oil filling and oil filtration for 1 x 30 MVA 132/11 kV transformer |
TNB PMU at Sungai Raya Muar. |
October 2003 |
| Permata Innovasi Sdn. Bhd. on behalf of TNB |
Transformer installation and oil filtration for 2 x 30 MVA 33/11 kV transformer |
TNB PPU at Mutiara Damansara |
November 2003 |
| HL System on behalf of TNB Distribution, Shah Alam |
Transformer installation and oil filtration for 1 x 15 MVA 33/11 kV transformer |
TNB PPU at Rawang Batu 16 |
October 2004 |
| Akli (M) Sdn. Bhd. on behalf of TNB Distribution Putrajaya |
Transformer refurbishment for 30 MVA 33/11 kV Sengyang Transformer c/w oil filtration, gasket change and repainting the whole body of transformer |
Cyberjaya PPU6 |
March 2005 |
| HL System on behalf of TNB Distribution, Shah Alam |
Transformer installation and oil filtration for 2 x 30 MVA 33/11 kV transformer |
TNB PPU at Bukit Lancung, Shah Alam |
April
2005 |
| Akli (M) Sdn. Bhd. on behalf of TNB Distribution Putrajaya |
Transformer refurbish including HV & LV Bushing gasket replacement, Main tank top inspection cover gasket, repainting , filtration and etc c/w carry out oil drain procedure for T1 & T2 |
Putrajaya
PPU4 |
June
2006 |
| Akli (M) Sdn. Bhd. on behalf of TNB Distribution Putrajaya |
Transformer refurbish including HV & LV Bushing gasket replacement, Main tank top inspection cover gasket, repainting , filtration and etc c/w carry out oil drain procedure for T1 & T2 |
Putrajaya
PPU5 |
July 2006 |
PTIS Engineering Sdn.Bhd. on behalf of TNB Dist. Putrajaya |
Transformer maintenance-leaking repair and CT Terminal bushing replacement for all Sengyang Transformer 7 x 30 MVA 33/11 kV |
Putrajaya and Cyberjaya |
July 2007 |
Tonggak Selatan Sdn.Bhd. on behalf of TNB Dist. Putrajaya |
Transformer refurbish including OLTC chamber gasket replacement, Main tank top inspection cover gasket, repainting , filtration and etc c/w carry out oil drain procedure for T1 & T2, 30 MVA 33/11 kV |
Putrajaya PPU6
&
Cyberjaya CJ7. |
September
2007 |
| Metro Kristal Sinar Sdn. Bhd. |
Kerja-kerja merombak, memasang dan memula tugas 2 x 30MVA 132/11kV alat ubah kuasa (T1 & T2) dari lapangsuis sementara ke lapangsuis kekal. |
PMU Kuantan, Pahang. |
April 2008 |
| Zest Module (M) Sdn. Bhd. |
Transformer Oil Filtration for 2 x 90MVA 132/33kV |
PMU Tanjung Langsat, Johor |
March 2009 |
| Musteq Hydro Sdn. Bhd. |
Maintenance work of AUX transformer 1 x 100kVA 33/0.433kV |
Upper Power House, Kenerong Hydro Power Station. |
March 2009 |
| Malaysia Transformer Manufacturing Sdn. Bhd. |
Transformer Oil Filtration and ABB OLTC |
Kapar Energy Ventures. |
June 2009 |
| Malaysia Transformer Manufacturing Sdn. Bhd. |
Transformer Oil Filtration – Mitsubishi Transformer GT2 |
S.J Temenggor. |
June 2009 |
| Malaysia Transformer Manufacturing Sdn. Bhd |
Transformer Oil Filtration – MTM Transformer & OLTC |
PPU TLDM Lumut. |
July 2009 |
| Malaysia Transformer Manufacturing Sdn. Bhd |
Transformer oil filtration, draining, vacuuming and oil test for 2 X 30MVA 132/11KV Hyusung Power transformer |
PMU Ayer Keroh, Melaka. |
July 2009 |
| Malaysia Transformer Manufacturing Sdn. Bhd |
Transformer oil filtration, draining, vacuuming and oil test for 2 X 15MVA Jian Xi Power transformer and OLTC |
PPU Bandar Baru Sungai Buluh. |
August 2009 |
| Malaysia Transformer Manufacturing Sdn. Bhd |
Oil Filtration Earthing transformer |
PMU Bukit Jelutong, Shah Alam, Selangor. |
September 2009 |
| Malaysia Transformer Manufacturing Sdn. Bhd |
Oil draining, oil filtration inside skid tank and main tank (8000litres), separate OLTC oil filtration, vacuuming and oil test before and after for T1 15MVA 33/11kV |
PPU Padang Tembak. |
December 2009 |
| MHM Electrical & Engineering Sdn. Bhd. |
Installation, Pre-Commissioning & Testing of 2 X 30MVA 33/11KV MTM Power transformer and 1 X Local Transformer |
PPU Keluli 12, Johor Darul Takzim. |
December 2009 |
| MHM Electrical & Engineering Sdn. Bhd. |
Installation, Pre-Commissioning & Testing of 2 X 30MVA 33/11KV MTM Power transformer and 1 X Local Transformer |
PPU Jalan Universiti, Selangor Darul Ehsan. |
December 2009 |
| Malaysia Transformer Manufacturing Sdn. Bhd. |
Oil filtration for GT1A 285MVA 15/275KV and oil draining, vacuuming and oil filtration for STN1A, 32.5MVA |
Tuanku Jaafar Power Station, P.D. |
March 2010 |
| MHM Electrical & Engineering Sdn. Bhd. |
Installation, Pre-commisioning & testing of 1 X 30MVA 33/11KV TX2, MTM Power transformer |
PPU Bukit Indah, Johor Bharu. |
March 2010 |
| MHM Electrical & Engineering Sdn. Bhd. |
Installation, Pre-commisioning & testing of 2 X 30MVA 33/11KV TX1 & TX2, MTM power transformer |
Stesyen Switch Solaris Dutamas, Kuala Lumpur. |
March 2010 |
| Malaysia Transformer Manufacturing Sdn. Bhd. |
Transformer vacuuming & oil filtration |
Pergau Power Station, Kelantan. |
April 2010 |
| S.M. Muhibah Heavy Engineering & Construction (M) Sdn.Bhd. |
Transformer vacuuming and oil filtration for 1 X 15MVA Power Transformer |
PMU Jerantut. |
April 2010 |
| Anpec Global Corporation Sdn. Bhd. |
Kerja-Kerja mengimpal dan mengecat alatubah T1 30MVA 132/KV buatan Hyosung |
PMU Yong Peng South 132/11KV |
July 2010 |
| Anpec Global Corporation Sdn. Bhd. |
Transformer Maintenance – Main Tank top cover welding, gasket replacement, whole transformer body repainting c/w vacuuming and oil filtration for 7.5MVA 132/11 KV ELTA power transformer |
PMU Jerantut. |
July 2010 |
| S.M. Muhibbah Heavy Engineering & Construction (M) Sdn. Bhd. |
Transformer oil change, vacuuming and oil filtration for 1 X 15MVA 132/11 kV power transformer |
PMU Jengka Pahang. |
July 2010 |
| Anpec Global Sdn. Bhd. |
Supply labour for Inter Bus transformer maintenance |
PMU Yong Peng North. |
December 2010 |
| I.A Services Sdn. Bhd. |
Transformer Oil Top-Up and oil filtration for 1 X 30MVA 33/22/11kV MTM/CGL transformer |
PMU Papan, Ipoh. |
January 2011 |
| Malaysia Transformer Manufacturing Sdn. Bhd |
Oil Filtration & Vacuuming for 30MVA 132/32KV transformer |
PMU Parit Yusof ,Batu Pahat Johor. |
February 2011 |
| MNA Trading Sdn. Bhd. |
Installation, Pre-Commisioning & testing of 2 X 30MVA TX1 & TX2 MTM power transformer |
Taman Putri Kulai Jaya, Johor Bahru. |
February 2011 |
| MNA Trading Sdn. Bhd. |
Installation, Pre-Commisioning & testing of 2 X 30MVA TX1 & TX2 MTM power transformer |
Damansara Aliff, Kempas Johor Bahru. |
February 2011 |
| Malaysia Transformer Manufacturing Sdn. Bhd. |
Oil Filtration and vacuuming process for 2 unit transformer T1 & T2 12.5MVA 22/6.6KV ATA POLAND |
PPU Kastam, Johor. |
March 2011 |
| Malaysia Transformer Manufacturing Sdn. Bhd. |
Oil Filtration for 1 X 30MVA 33/11KV VEB transformer |
PPU Uda Bangsar, Kuala Lumpur |
March 2011 |
| Malaysia Transformer Manufacturing Sdn. Bhd. |
Oil Filtration & Services transformer for 2 unit transformer 12.5MVA 22/6.6KV |
PPU JB Perdana, Johor Bahru. |
May 2011 |
| Fausniaga Sdn. Bhd. |
Installation, Pre-Commisioning & testing of 2 X 15MVA, 33/11KV, TX1 & TX2, MTM Power transformer |
PPU UMK Bachok, Kelantan. |
May 2011 |
| I.A Services Sdn. Bhd. |
To Oil Filtration & Vacuuming of 2 X 5MVA 33/11KV at PPU PULKA Bentong Pahang, 2 X 30MVA 33/11KV at PPU Tampoi, Johor & 2 X 10MVA 33/11kV |
PPU Energy Ventures, Kapar Selangor. |
July 2011 |
| Musteq Hydro Sdn. Bhd. |
Transformer Maintenance : Oil Filtration For Upper Station Unit 11 and lower station unit T23 |
Kenerong Hydro Power Station. |
August 2011 |
| MTM Transformer Manufacturing Sdn. Bhd. |
Oil Filtration for 2 X 12.5MVA 22/6.6KV FUZHOU Tx |
PPU Taman Sentosa, Johor Bahru. |
August 2011 |
| Duta Technic Sdn. Bhd. |
Transformer accessories erection c/w vacuum oil filling and filtration for 2 x 90 MVA 132/90 kV Pouwels Trafo transformer |
PMU Sg Karang, Tg. Bin, Johor. |
February 2012 |
Client |
Project |
Location |
Year |
| Balfour Beatty Rail Sdn.Bhd. on behalf of KTMB |
Transformer installation and vacuum oil filling for 2 x 20 MVA 132/25 kV transformer |
Rawang Feeder Station |
September
2003 |
| Akran Engineering Sdn. Bhd. (Universiti Islam Antarabangsa Malaysia) |
Transformer maintenance, gasket replacement and oil filtration for TX 3, 1 X 15 MVA 33/11 kV |
UIA PMU at Gombak |
March 2004 |
| Perusahaan Otomobil Nasional Berhad |
Transformer condition monitoring (51 units transformer) |
PROTON Substation and Power House |
September
2004 |
| SISMA Enterprise Sdn. Bhd. on behalf of MTM |
Transformer installation, vacuum oil filling and oil filtration for 1 x 90 MVA 132/33 kV ABB transformer |
SISMA / MTM, Ulu Klang |
October 2004 |
| JM Electrical Services Sdn. Bhd. for AREVA Singapore |
Transformer installation, vacuum oil filling and oil filtration for 2 x 25 MVA 11/6.9 kV Alsthom transformer |
MSE, Pasir Gudang |
December 2004 |
| PROTON Casting Sdn. Bhd. Shah Alam |
Transformer Maintenance leaking repair c/w oil top-up and Filtration for 2000 kVA ABB transformer |
PROTON Casting Shah Alam |
March
2005 |
| Balfour Beatty Rail Sdn.Bhd |
To carry out transformer drain for radiation replacement & vacuum oil filling c/w filtration |
Sungkai Feeder |
June
2005 |
| SPM-TACS Services (M) Sdn. Bhd. |
Supervision of Transformer oil reclamation |
KLIA Airport 33 kV Substation |
December 2005 |
| PROTON Tanjung Malim Sdn.Bhd. |
To repair and service transformer 33/11 kV |
Energy Center, PROTON |
January 2006 |
| NEXUS ENERGY Sdn.Bhd. on behalf of Amsteel |
Oil filtration and supply of gasket for 80 MVAr reactor |
Siemens factory |
February 2006 |
| MMC Metal Industries Sdn.Bhd. |
Transformer maintenance-leaking repair,repaint,oil top-up & filtration for transformer unit Tx 3 |
Ipoh, Perak |
February 2007 |
PTIS Engineering Sdn.Bhd. on behalf of MTM. |
Transformer installation and vacuum oil filling c/w oil filtration for 2 x 90 MVA 132/11 kV |
PMU Skudai |
May 2007 |
| TXM Services Sdn. Bhd. |
Transformer Maintenance - Oil drain, HT Bushing Gasket replace and re-termination 33kV joint c/w oil filtration for 1 x 10MVA 33/11kV Transformer |
Puncak Niaga (M) Sdn. Bhd. |
February 2008 |
| Perusahaan Otomobil Nasional Sdn. Bhd. |
Service OLTC - ABB 33kV 10MVA Transformer TX-02 |
Power House |
August 2008 |
| TXM Services Sdn. Bhd. |
Transformer Maintenance - Leakage repair on LV Bushing, Neutral Bushing and oil filtration for 1 x 35MVA Power Transformer 132/11kV |
Lafarge Cement, Rawang. |
November 2008 |
| TXM Services Sdn. Bhd. |
Transformer Maintenance - Carry out leakage repair on LV Bushing for 1 x 3150kVA 11/.433kV |
Intel, Kulim Hi-Tech, Kedah. |
January 2009 |
| TXM Services Sdn. Bhd. |
Transformer Maintenance Malay-Sino Chemical Industries Sdn. Bhd. |
Malay-Sino Chemical Industries Sdn. Bhd. |
June 2009 |
| TXM Services Sdn. Bhd. |
Transformer maintenance |
Lafarge Malayan cement, Rawang Selangor. |
September 2009 |
| PROTON Shah Alam. |
Replace oil transformer No.3 10 MVA 33/11KV Brand ABB at Power house inclusive filtration and oil sampling analysis. |
PROTON Shah Alam. |
October 2009 |
| PROTON Shah Alam. |
Repair oil leakage at bushing gasket ( ABB Transformer at main plant & MVF ) |
PROTON Shah Alam. |
October 2009 |
| TXM Services Sdn. Bhd. |
Outdoor Surge Arrester, Isolator and circuit breaker cleaning for Lafarge Rawang outdoor switch yard equipment. |
Lafarge Malayan cement, Rawang Selangor. |
March 2010 |
| SHR Engineering (M) Sdn. Bhd. |
Transformer maintenance – leakage repair C/W refurbishment and testing of 1 X 15MVA 33/11KV |
University Kebangsaan Malaysia, Bangi. |
May 2010 |
| Samsung SDI (Malaysia) Bhd. |
Leakage repair for 1 unit of 2500KVA transformers (TR-8302) |
Samsung SDI (Malaysia) Bhd. |
June 2010 |
| TXM Services Sdn. Bhd. |
Supply and replace 4 units new breather with capacity 1kg silica gel for three phase rectifier transformer Tx10, 11, 12 and 13 |
Amsteel, Banting. |
Agust 2010 |
| TXM Services Sdn. Bhd. |
Transformer maintenance- leakage repair c/w oil filtration for tpe-1 plant main 20 MVA 22/6.6KV Pouwel transformer (TR-9801) |
Titan, Pasir Gudang. |
April 2011 |
| UT Generation Sdn. Bhd. |
To supply, installation, testing, commissioning & maintenance of electrical services for electrical services for existing CSR CX2 Sdn. Bhd. Data centre of CSF computer Exchange. |
CSR CX2 Sdn. Bhd. |
October 2011 |
| McGIL Supply & Services |
To replace main tank top gasket only work including ; filtration, top up oil & oil testing , main tank gasket replacement. Transformer 750KVA |
Hunstman Tioxide (M) Sdn. Bhd. |
October 2011 |
| Sapura Malaysian Advanced Refurbishment Services Sdn. Bhd. |
To provide tolls, equipment & Skilled manpower to rectify oil leakage at butterfly valves (12 NOS) & PRD for 1 X 25MVA 132/6.6KV transformer No.2 |
Sapura Malaysian Advanced Refurbishment Services Sdn. Bhd. |
October 2011 |
| PROTON Shah Alam. |
Replace the on-load tap changer (OLTC) oil of abb 10MVA 33/11KV transformer TX#03/TX#4 at Power House. |
PROTON Shah Alam. |
January 2012 |
| TRMS Engineering Sdn. Bhd. |
OLTC filtration |
SGL Carbon, Banting, Selangor. |
February 2012 |
| Perusahan Otomobil Nasional Sdn. Bhd. |
To supply and replace of Bushing Gasket complete with top up of oil transformer inclusive oil filtration works for 33kv/11kv 10MVA transformer no.3 & 11kV/ 415V 2000KVA ABB transformer no-38. |
Perusahan Otomobil Nasional Sdn. Bhd. |
March 2012 |
Client |
Project |
Location |
Year |
| TXM Services Sdn. Bhd. |
Transformer maintenance – vacuum dehydration for 2 x 5 MVA and 2 x 1500kVA |
BP Chemical in Gebeng, Pahang |
August 2006 |
Natural Places (M) Sdn. Bhd. |
Transformer refurbish including HV & LV Bushing gasket replacement, Turret gasket replacement, inspection cover gasket, vacuum oil filling, repainting and filtration |
CUFK Petronas Gas Berhad, Kertih. |
July
2007 |
PTIS Enginnerin Sdn.Bhd. on behalf of AREVA Singapore |
Transformer refurbish including OLTC servicing, chamber gasket replacement, Main tank top gasket replacement, inspection cover gasket, repainting , filtration and etc c/w carry out oil drain procedure for 2 x 48 MVA 132/33 kV and 2 x Earthing Transformer |
Shell Refinary, Port Dickson. |
October 2007 |
| AKM Teknik Sdn. Bhd. |
Transformer Oil Change c/w oil filtration for 2 x 10MVA 33/11kV |
Petronas Research, Bangi. |
February 2008 |
| AKM Teknik Sdn. Bhd. |
Transformer Maintenance - MR OLTC Servicing Model V III 200 D c/w oil filtration for 2 x 7.5MVA 22/11kV |
Petronas Research, Bangi. |
February 2008 |
| TXM Services Sdn. Bhd. |
Transformer Maintenance - Top Gasket replacement c/w oil top-up and oil filtration for 1 x 1.5MVA 22/.433kV |
IOI Loders Croklaan, Pasir Gudang. |
February 2008 |
| PTIS Engineering Sdn. Bhd. |
Transformer Maintenance - Total refurbish of 2 x 48MVA 132/33kV Earthing Transformer |
Shell Refinary, Port Dickson. |
February 2008 |
| Transformer Oil Lab & Services Sdn. Bhd. |
Transformer Maintenance - LV Bushing Gasket replacement c/w oil top up and filtration for 1 x 8MVA 11/3.3kV |
Petronas Penapisan (T) Sdn. Bhd. |
July 2008 |
| Jurutera Uji Tatah Sdn. Bhd. |
Transformer Maintenance - Main Tank top gasket and Bushing gasket replacement for 3 x 125kVA |
BASF, Pasir Gudang. |
February 2009 |
| Natural Places (M) Sdn.Bhd. At CUF Kerteh. |
Transformer Maintenance – Repair transformer leak |
PGB – CUF Kerteh. |
May 2009 |
| TRMS Engineering Sdn. Bhd. Kerteh. |
Transformer repair work |
Petlin, Kerteh. |
November 2009 |
| Nexus Energy Sdn. Bhd. |
Transformer Vacuum oil filling C/W oil filtration and leak test for 1 X 100MVA 132/34.5/11KV |
Ethylene Malaysia Sdn. Bhd. |
January 2010 |
| Natural Places (M) Sdn. Bhd. |
Transformer maintenance - Transformer oil leak repair |
Petronas Penapisan (Melaka) Sdn. Bhd. |
January 2010 |
| Shell Refining Company |
Transformer lekage repair for HV & LV bushing, inspection cover and necessary. |
Shell Refining Company |
September 2010 |
| Shell Refining Company |
Transformer refurbishment c/w gasket change, oil filtration and repainting the whole transformer body. |
Shell Refining Company |
December 2010 |
| Natural Places Sdn. Bhd. |
Transformer Maintenance – Transformer oil leak repair 9 units 11 kV up to 132 kV 70/90 MVA |
Petronas Penapisan (Melaka) Sdn. Bhd. |
February 2011 |
| Tenaga Setiavesta Sdn. Bhd. |
Provision for power and distribution transformer oil leak rectification and repair works for 19 units. 11 kV up to 132 kV transformer |
Petronas Penapisan (Melaka) Sdn. Bhd. |
February 2011 |
| Shell Refining Company (Federation of Malaysia) |
Transformer Refurbishment – gasket replacement for all gasket section including main tank top cover, HV & LV bushing, inspection cover, valves, flanges c/w oil filtration and repainting the whole transformer body for unit TR60 BD4 33/6.6kV |
Shell refining company, Port Dickson. |
April 2011 |
| TRMS Engineering Sdn. Bhd. |
Transformer Maintenance : LV / Secondary Side Bushing Gasket Replacement |
PFKSB. |
September 2011 |
| TRMS Engineering Sdn. Bhd. |
Transformer oil sampling and analysis |
Petlin, Paka, Terengganu. |
November 2011 |
| Anugerah Kecapaian Sdn. Bhd |
Transformer Oil Leak Repair |
Petronas Penapisan Melaka Sdn. Bhd. |
November 2011 |
| PTIS Engineering Sdn. Bhd on |
Replace and maintenance TR132BD1 |
Shell Refining Company. |
January 2012 |
| TRMS Engineering Sdn. Bhd. |
Oil sampling and OLTC oil change |
PFK, Gurun, kedah. |
March 2012 |